| The trench is dug. The vent assembly sticks up,
with toilet drain visible at right. The shower drain is off to the left, and
the sewer-line pipe will connect down the center. |
The drain pipe has been extended (center), shower drain
sticks up at left. The toilet drain can
still be seen sticking up on the right. |
End of Day 1! The trench is cemented over. The toilet
drain is visible at lower left, the vent is connected in the
center, and the shower base has been installed on the right. |